Designed and engineered a new pre-fabricated concrete building as well as the new generator systems at Casper Mountain East, WY. Removed existing corrugated metal building propane tanks and pipes. Prepared site for installation of prefabricated concrete building and foundation. Furnished all materials and performed all work required to erect the new building. Installed double gate chain link fence. Removed existing 15kW generator and installed new 25kW generator and automatic transfer switch to provide emergency backup power to the site. Installed new 500-gallon fuel tank, electrical power distribution panels, breakers, cables and service entrance.